Probes
1. Case test - done
2. Case production – in progress
3. Case test with strain guage
4. Order
5. Xemics coms board – C
code ready
6. PCB production
7. First sealed probe with electronics – 24hr
tests at 0C
8. Test coms and
range in air
9. Test burst mode
10. Wired probe
11. Cable
12. Resistance test with sediment and a real
probe
13. Crush test with strain readings – mech eng
Base station
1. I2C in progress
2. Digital line control DONE
3. Test GPS code
4. Test GPS switcher
5. Test GSM
6. Test snow meter
7. Overall control programme
8. USB camera, SW, box
9. Test control PCB – PIC code
10. PPP dialup, wired, with modem
11. Weather station interface
prog.
12. Weather station mechanics
13. Integrate Xemics
board & Talk to probe with LR
14. Buy base box, Bats, make cables
15. Design tripod reinforcement
16. Make blanking plate for old base box with
power & Solar
17. Low temperature test boards to -10C
18. Build 2 wired (potted)
antennas/transceivers & connector
Location System
1. PCB production
2. Test Counter2
3.
Waiting
for Joe’s PCB mods done
4. Build and test counter linked to receiver
5. Test two receivers, with 10MHz ext clock
6. Waiting for PCB
7. SW for XYZ compute
8. antennas
Reference station
1. Test GPS
2. Write GPS get-time func
3. PPP dialup config
4. Write Control prog/cron
5. SW to interpret Data into standard format
Weather station
1.
Standalone
test done
2. Design fixing to tripod
3. Test power control and use
4. Port code
Complete System
5. Test probe-Base talk sequence
6. Test two GPS readings, base/ref
7. Complete system test except positioning
8. Accelerated position test
9. Complete system tests with positioning
10. With Long Range
Coms up/down
11. With ref coms to
Leo
Logistics
12. Water filter, ramps
13. Food shop
14. Food pack
15. Till sampler/cutter DONE
16. Probe inserter
17. Old instruments
18. Bill D. testing sensors
19. Borehole cam – test & mark old one
20. Build new one – and mark up distance
21. Learn dGPS SW
22. TEST iPAQ
software for mapping
23. T-shirts DONE
24. Poster – make & translate
25. Helicopter – order number
26. Risk Assessment DONE
27. Pack hardware
28. Pack Electronics
29. Kathryn
30. Flight to Bergen DONE
31. SAS/Brathens
refund or name change.. DONE
32. Al helps drive to Newcastle?
33. Ask Electronics climber?
34. GPR box (KM)