Probes

1.       Case test - done

2.       Case production – in progress

3.       Case test with strain guage

4.       Order

5.       Xemics coms board – C code ready

6.       PCB production

7.       First sealed probe with electronics – 24hr tests at 0C

8.       Test coms and range in air

9.       Test burst mode

10.   Wired probe

11.   Cable

12.   Resistance test with sediment and a real probe

13.   Crush test with strain readings – mech eng

Base station

1.       I2C in progress

2.       Digital line control DONE

3.       Test GPS code

4.       Test GPS switcher

5.       Test GSM

6.       Test snow meter

7.       Overall control programme

8.       USB camera, SW, box

9.       Test control PCB – PIC code

10.   PPP dialup, wired, with modem

11.   Weather station interface prog.

12.   Weather station mechanics

13.   Integrate Xemics board & Talk to probe with LR

14.   Buy base box, Bats, make cables

15.   Design tripod reinforcement

16.   Make blanking plate for old base box with power & Solar

17.   Low temperature test boards to -10C

18.   Build 2 wired (potted) antennas/transceivers & connector

Location System

1.       PCB production

2.       Test Counter2

3.       Waiting for Joe’s PCB mods done

4.       Build and test counter linked to receiver

5.       Test two receivers, with 10MHz ext clock

6.       Waiting for PCB

7.       SW for XYZ compute

8.       antennas

Reference station

1.       Test GPS

2.       Write GPS get-time func

3.       PPP dialup config

4.       Write Control prog/cron

5.       SW to interpret Data into standard format

Weather station

1.       Standalone test done

2.       Design fixing to tripod

3.       Test power control and use

4.       Port code

Complete System

5.       Test probe-Base talk sequence

6.       Test two GPS readings, base/ref

7.       Complete system test except positioning

8.       Accelerated position test

9.       Complete system tests with positioning

10.   With Long Range Coms up/down

11.   With ref coms to Leo

Logistics

12.   Water filter, ramps

13.   Food shop

14.   Food pack

15.   Till sampler/cutter DONE

16.   Probe inserter

17.   Old instruments

18.   Bill D. testing sensors

19.   Borehole cam – test & mark old one

20.   Build new one – and mark up distance

21.   Learn dGPS SW

22.   TEST iPAQ software for mapping

23.   T-shirts DONE

24.   Poster – make & translate

25.   Helicopter – order number

26.   Risk Assessment DONE

27.   Pack hardware

28.   Pack Electronics

29.   Kathryn

30.   Flight to Bergen DONE

31.   SAS/Brathens refund or name change.. DONE

32.   Al helps drive to Newcastle?

33.   Ask Electronics climber?

34.   GPR box (KM)